j9九游会

Customer Feedback

15 Units 45000 Liters Palm Oil Tanker Trailer will be shipped to Nigeria

45000 Liters Palm Oil Tanker Trailer for Sale In Nigeria45000 Liters Palm Oil Tanker Trailer for Sale In Nigeria

The Nigerian customer is a well-known local transportation company, which mainly transports various liquids, such as petroleum, palm oil, and edible oil. The sales manager William recommends 3 axle 45000 liters palm oil tanker trailer with 3 compartments according to customer needs. It can transport 3 kinds of liquids, which greatly improves work efficiency.

The customer bought 15 units palm oil tanker trailer due to the huge business volume. After the completion, the sales manager William took a lot of pictures and videos to the customer, and they passed strict tests. Ensure that customers receive high-quality palm oil tanker trailer. Below is 15 units 45000 liters palm oil tanker trailer.

Palm Oil Tanker Trailer with Best Price Palm Oil Tanker Trailer with Best Price 

Measures to prevent oil leakage of 3 axle 45000 liters palm oil tanker trailer

1. Lining effect. The gaskets between the parts of the stationary parts of the automobiles (such as each joint end face, each end cover, shell, cover cushion, flat enamel cover, etc.) play a role of leak-proof sealing. If the material, production quality and installation do not meet the technical specifications, the sealing and leak-proof function will not be achieved, and accidents may even occur.

For example, the oil pan or valve cover is difficult to compact due to the large contact area, which causes oil leakage.

2. All kinds of fastening nuts of palm oil tanker trailer need to be tightened according to the specified torque. If the packing is too loose or not tight, the gasket will leak; if it is too tight, the metal around the screw hole will bulge or the thread will be slipped and cause oil leakage. In addition, if the oil drain plug of the oil pan is not tightened or loosened or falls off, it is easy to cause oil loss, and then the machine damage accident of "burning tile and holding shaft" will occur.

3. Replace the failed oil seals in time. Many moving parts of the 3 axle 45000 liters palm oil tanker trailer will be incorrectly installed, and the journal and the oil seal cutting edge will be out of concentricity and will swing and throw oil. Some oil seals will lose their elasticity due to the aging of the rubber when they are used for a long time. Any leakage should be updated in time.

15 Units Palm Oil Tanker Trailer for Sale Near Me15 Units Palm Oil Tanker Trailer for Sale Near Me

4. Avoid blockage of check valves and vent valves. As a result, the temperature in the tank will increase, and the oil and gas will fill the entire space and cannot be discharged, which will increase the pressure in the tank and reduce the consumption of lubricating oil and shorten the replacement cycle.

After the engine ventilation system is blocked, movement resistance is caused, which causes fuel consumption. Due to the difference in air pressure between the inside and outside of the case, it often causes oil leakage at the weak seal. Therefore, the 3 axle 45000 liters palm oil tanker trailer needs to be regularly inspected, dredged and cleaned.

5. Properly solve the sealing of various oil pipe joints. Vehicle union nuts are often disassembled and assembled, and they are easy to slip and loose, which may cause oil leakage. Replace the union nut, use the grinding method to solve the conical surface seal, and press the nut to solve the seal.

6. Avoid oil slinging from the wheel hub. Excessive wheel bearings and lubricating grease, or improper oil packaging, poor quality and aging failure; the excessively high temperature of the wheel caused by braking; loose axle nuts, etc. will cause the wheel to throw oil. Therefore, it is necessary to use the "cavity lubrication method (that is, an appropriate amount of lubrication)" to clear the vent.

Details of 3 Axle Palm Oil Tanker TrailerDetails of 3 Axle Palm Oil Tanker Trailer

When liquefied petroleum gas flows from nozzles, nozzles or damaged places at high speeds, static electricity is likely to be generated. In the middle discharge danger group for dilution and explosion suppression, the ground wire of the tank tail and valve box should be connected to the earth in time.

Venting the danger refers to when the liquefied petroleum gas When the tanker truck leaks and cannot be handled, use spray water to dilute the leaked LPG while cooling the tank body, wait for the liquid in the tank to drain naturally, and take precautions before taking emptying and risk relief measures.

The scope of the danger zone should be determined according to the geography and wind direction; the fire source should be controlled in the warning zone; the gas phase discharge and the discharge flow rate should be controlled; the downwind direction should be set up with a water curtain for water dilution; Accidents such as impact, rubbing, tipping, etc., if the gas-filled liquid phase valve or pipeline in the valve box ruptures and leaks, emergency measures to stop the leakage by closing the emergency shut-off valve.

Factory Show of 45000 Liters Palm Oil Tanker Semi TrailerFactory Show of 45000 Liters Palm Oil Tanker Semi Trailer

在线留言

whatsapp
j9九游会